Set up the conditions in order that the
application evolves correctly in the future
The future evolution will come:
either from the correction of mistakes and nonconformities
or from the evolution of the users requirements
or from the evolution of the technology
Set up the conditions:
the next changes should ensure
that they respect the quality and reliability purposes and norms, the methodology fixed by the Architecture Design, the Preliminary Study and the Detailed Study, together with the coherence of the whole;
that the Architecture Design, the Preliminary Study and the Detailed Study will be updated whenever required.
the next updates must be launched in production without raising problems, by respecting the acceptance criteria.
The updates and add-ons must be brought
to the different levels of analysis and realization:
System Architecture Design
Preliminary Study
Detailed Study
Realization
perform an individual follow-up of every change request; estimate the needed resources
follow as well the change requests coming from the users as those coming from the IT department self
Rank the requests; manage the priorities; set up a planning
Do a clear distinction between errors corrections and new or complementary requests; control the resources used by all three types of intervention.
Open the
Changes follow-up file
Analyze the request before any realization
Identify as precisely as possible the components affected by a change request
search for the real cause of the detected dysfunction symptoms
evaluate systematically the impact of every change on the different analysis levels; if there is an impact, adapt the concerned analysis parts
let validate the change request by the due responsibility level
Identify all possible consequences of a change
links between several revisions
requirement of a conversion/correction of the existing data
revision of the documentations
change in the operating mode; requirement of new training.
Inform systematically the people having raised a change request of its follow-up
Launch in production of the revisions.
Test the revision
take care that all unit tests are correctly passed
control the possible consequences on the performances
when links exist between several components, take care that they are all installed at the same time
Inform:
deliver the documentation
inform about the changes in the operation mode
Inform systematically the people at the origin of the change request when it is launched in production
Inform systematically of all changes the key-users and the people in charge of the operations and of the help desk
When revisions are launched in emergency, without that all quality actions are performed:
make sure that the due quality actions will be applied as soon as possible
these revisions must be specially traced; the reason and the responsibilities must be noticed.