Sequoia it development methodology
 | welcome page | projects | contact us | get  the free off-line version |

DETAILED STUDY

Phase DS.0 Start up

DS.0.1 Purposes

(-)  Set up the specifications for the detailed study

(-)  Precise the way the study will be performed with the people in charge of it ( Project Plan )

(-)  Start up the quality assurance procedure ( Quality Plan ) for both steps detailed study and realization.

(-)  Decide to launch a detailed study, that will normally be followed automatically by the realization.

(-)  Inform all concerned people

DS.0.2 Realization actions

(-)  Be informed of the preliminary study and the system architecture design.

At the beginning of the detailed study, you should know :

- the existing system thanks to a detailed enough description.

- the objectives, constraints, scope of the detailed study and of the realization.

- the functional solution; you know that this one will solve and the normal representative cases and the special cases.

- technical guide lines.

(-)  Set up the results expected from the detailed study

reports to be produced, presentations

DS.0.3 Project management actions

(-)  Name the project manager

(-)  Set up the Steering Committee

(-)  Fix the guide lines for an integrated analysis, development and maintenance methodology (of be informed of the existing methodology)

development tools (Case Tools)

documentation procedures

(-)  Identify the needed resources

(-)  technical infrastructure

(-)  human resources

(-)  planning

(-)  budget

(-)  Identify the risk factors (reduce them whenever possible)

in terms of probability

in terms of importance and costs

DS.0.4 Quality assurance actions

(-)  Update and let validate the Quality Plan that will be applied to the detailed study and to the realization

(-)  Define and customize the project quality purposes

identify the key factors concerning the quality.

(-)  Name the people in charge of the quality assurance; define their role

Quality Manager

Project Manager

Customer Representative

(-)  Make sure that the methods and procedures are conform to the quality purposes. This concerns in particular the integrated analysis, realization and maintenance methodology .

(-)  If the procedures and methods are not yet fixed (new development tool), it is now the right moment to do it.

(-)  Make sure that all concerned people have a good knowledge of the methodology; document it and train the team if necessary.

(-)  Make sure that you will use suitable control procedures In particular:

(-)  take care that you have a complete definition of the products to be delivered

(-)  Precise the way the detailed study and the realization will be received

(-)  open the Acceptance File

(-)  Make sure that the resources needed by the project will be available. In particular, the responsibilities of everyone must be clearly defined.

(-)  Fix the formal review points, or the project Quality Audit points.

DS.0.5 Phase closing actions

(-)  Decisions & communication:

(-)  Make the decision to launch the detailed study

(-)  Agree on the Quality Plan .

(-)  Present the study to all concerned people

get motivation & inform

let know the Quality Plan by all involved people; take care that all necessary information is available.